Project requirements
Ratings, smoke control, sizes, handing, configurations, wall types and other performance requirements are identified from the schedule and specification.
Fire performance depends on the compatible combination of leaf, frame, seals, glazing, ironmongery, preparation and installation. Our project review and manufacturing controls are built around that principle.
We do not treat a fire rating as a label that can be applied to any arrangement. Each proposed configuration is reviewed against the relevant supporting evidence and agreed project information before manufacture.
Ratings, smoke control, sizes, handing, configurations, wall types and other performance requirements are identified from the schedule and specification.
Frames, seals, glass, beads, hinges, locks, closers and specialist hardware must remain compatible with the selected construction.
Approved dimensions and preparation details are transferred into controlled production information and repeatable CNC programmes.
Material, machining, assembly and finish details are checked through the manufacturing sequence and before dispatch.
Project and door references can be coordinated to support identification across schedules and phased deliveries.
The agreed documentation scope is coordinated with the quotation and order so project teams know what will be supplied.
The available rating or option depends on the particular door construction and its supporting test, assessment or field-of-application evidence. Maximum sizes, glazing, pairs, hardware and frame requirements can differ between systems.
Where a project names a certification scheme, certificate, core system or particular standard, include it with the enquiry so it can be reviewed against the proposed manufacturing route.
A fire door forms part of a building's passive fire-protection strategy. When correctly specified, manufactured, installed and maintained, it helps resist the passage of fire and smoke between compartments, protecting escape routes and providing additional time for evacuation and firefighting.
Performance is expressed as a period of fire resistance—commonly 30, 60, 90 or 120 minutes—but the rating applies to the tested or assessed doorset configuration, not simply to the door leaf in isolation.
Helps restrict fire and smoke to the compartment of origin.
Supports protected escape routes and safer evacuation.
Helps project teams and responsible persons meet applicable fire-safety requirements.
Can reduce the spread of damage through a building.
Requirements vary by project and jurisdiction. Hassock Wood reviews the information supplied for each doorset and manufactures within the applicable supporting evidence. The project designer, fire engineer, contractor, installer and responsible person retain their respective duties.
Provides statutory guidance in England on meeting the fire-safety requirements of the Building Regulations. Fire doorsets are considered as complete assemblies, including the leaf, frame and ironmongery.
Places duties on the responsible person for fire safety in workplaces and relevant common parts of residential buildings in England and Wales.
Introduces additional fire-door information and checking duties for responsible persons in certain multi-occupied residential buildings in England.
Configurations may be supported by test, assessment or field-of-application evidence to standards such as BS 476-22 or BS EN 1634-1, as required by the project.
Installation, inspection and maintenance must follow the applicable evidence, instructions, project requirements and recognised good practice.
Seals, glazing, frame, hinges, closer, lock, access-control preparation and other hardware must remain compatible with the approved arrangement.
Important: References to legislation and standards are general guidance only. The current project specification, fire strategy, product evidence and competent professional advice must always take precedence.
The correct construction depends on the fire strategy, exposure, security, accessibility and environmental requirements.
Final answers depend on the exact construction and supporting evidence. Send your schedule and specification for project-specific review.
No. Fire performance relates to the complete tested or assessed arrangement, including the leaf, frame, seals, glazing and compatible ironmongery.
No. Hardware type, material, size, position and preparation can affect performance and must be compatible with the applicable evidence.
They may be possible where the glass, glazing system, bead, aperture dimensions and location fall within the supporting evidence.
No. Permitted dimensions and configurations vary between systems. Oversize leaves, pairs, overpanels and side panels require specific review.
Provide the door schedule, fire strategy or specification, drawings, frame and wall details, glazing requirements, ironmongery schedule and finish references wherever available.
Responsibilities depend on the contract and building. Installation should be completed by competent persons in accordance with the applicable evidence, while the building's responsible person has ongoing fire-safety duties.
Where available, send the following with your door schedule or project enquiry.
References, ratings, sizes, handing, quantities and locations.
Required standards, smoke control and project-specific performance.
Configurations, glazing, interfaces and design intent.
Hinges, locks, closers, access control and specialist items.
Frame material, section and intended supporting construction.
Paint codes, veneer species, laminates and edge requirements.
We will identify what can be manufactured within the selected evidence and what needs clarification before quotation or production.